Our offer is exclusively directed at entrepreneurs (§ 14 BGB). For commercial customers only. No sales to end consumers. All prices are net prices excluding VAT.

Synchronous control 350mm stroke for 3 lifting columns 2.000N - 3.200

Synchronsteuerung 350mm Hub für 3 Hubsäulen 2.000N - 3.200
€139.56 *

Prices plus VAT plus shipping costs

available, please enquire about delivery time

  • 99.SYC3-350
  • 85371091
Syncontrol 3 EU Synchronous control for 3 lifting columns HEXALIFT 2.0 Baumeister &... more
Product information "Synchronous control 350mm stroke for 3 lifting columns 2.000N - 3.200"

Syncontrol 3 EU

Synchronous control for 3 lifting columns HEXALIFT 2.0 Baumeister & Schack with 350mm stroke

U: 220 - 240 V, 50/60 Hz, I: 3.5 A

Pout: 380 W

RJ12 slot for manual switch or as ModBus Connection

RS485 interface for ModBus RTU

Related links to "Synchronous control 350mm stroke for 3 lifting columns 2.000N - 3.200"
Synchronsteuerung 400mm Hub für 4 Hubsäulen Synchronous control 400mm stroke for 4 lifting...
  • 99.SYC4-400
  • €139.56 *

    available, please enquire about delivery time

    Synchronsteuerung 350mm Hub für 4 Hubsäulen Synchronous control 350mm stroke for 4 lifting...
  • 99.SYC4-350
  • €139.56 *

    available, please enquire about delivery time

    SYC-HS-Y-Verteiler-RJ12 Adapter Synchronsierung Handschalter + Steuerung (SYC) SYC-HS-Y-distributor-RJ12 adapter...
  • 99.SYC-HS-Y-RJ12
  • €14.27 *

    available, please enquire about delivery time

    HD240D350530MFF24 + EZ02252 Hubsäule 3.200 N (9 mm/s) EB 530 mm; Hub 350 mm mit Montagelaschen ink Kabel Lifting column HEXALIFT 2.0 Baumeister & Schack
  • 99.HD240D350530MFF24
  • €506.03 *

    available, please enquire about delivery time

    HM240D400580MFF24 + EZ02252 Hubsäule 2.000 N (9 mm/s) EB 580 mm; Hub 400 mm mit Montagelaschen ink Kabel Lifting column HEXALIFT 2.0 Baumeister & Schack
  • 99.HM240D400580MFF24
  • €360.51 *

    available, please enquire about delivery time

    Viewed